Blog

This is a subtitle for your new post

If the UKCA marking applies to products you manufacture or handle, you will have specific obligations and responsibilities for compliance, depending on your role.


The government intends to extend recognition of the CE marking for placing most goods on the market in Great Britain, indefinitely, beyond December 2024. These updates apply to the 18 regulations that fall under the Department for Business and Trade (DBT). These are:


  • toys
  • pyrotechnics
  • recreational craft and personal watercraft
  • simple pressure vessels
  • electromagnetic compatibility
  • non-automatic weighing instruments
  • measuring instruments
  • measuring container bottles
  • lifts
  • equipment for potentially explosive atmospheres (ATEX)
  • radio equipment
  • pressure equipment
  • personal protective equipment (PPE)
  • gas appliances
  • machinery
  • equipment for use outdoors
  • aerosols
  • low voltage electrical equipment

There are different rules for medical devicesconstruction productscablewaystransportable pressure equipment, unmanned aircraft systems, rail productsmarine equipment and ecodesign. The relevant departments covering these sectors either have communicated, or will communicate, plans in due course.


For more information and to read the UK Governments instructions at their original source please click here.







Download and Print
The Queen
By Original Source Sky News 15 Sep, 2022
The Queen's Funeral Details. Monday 19th September 2022.
Certification, UKCA & CE Marking
By Whisper Digital on behalf of Fireflow Products 20 Jul, 2022
CE Marking of Construction Products The Construction Product Regulation No. 305/2011/EC requires construction products to be CE marked based on requirements of relevant technical specifications (harmonized EN standards or European Technical Assessments (based on European Assessment document). In relationship to the Assessment and Verification of Constancy of Performance (AVCP), the manufacturer will have to work with a Notified Certification Body and/or a Notified Laboratory.
Big Ben light up at night
By Whisper Digital on behalf of Fireflow Products 17 Feb, 2022
Tough new measures that will force the industry to pay to remove the cladding and protect leaseholders from exorbitant costs have been unveiled by Secretary of State for Levelling Up Michael Gove.
Fireflow Products C E compliant
By Whisper Digital on behalf of Fireflow Products 11 Jan, 2022
Fireflow NSHEV Products Fully compliant BS: EN12101-2 2003 ( Transition to UKCA approved in 2021 )
Photograph of BIg Ben in London
By Whisper Digital on behalf of Fireflow Products 11 Jan, 2022
Housing Secretary Michael Gove is vowing to "expose and pursue" firms responsible for safety problems caused by cladding, the BBC has learned.
Big Ben in London
By Whisper Digital (Repost an article from thee Architects Journal website) 09 Nov, 2021
Housing secretary Michael Gove has said he is ‘unhappy with the principles’ of leaseholders paying for fire safety remediation costs – and suggested that ‘cowboy’ developers and manufacturers should cough up
London EU UK Flag
By Whisper Digital on behalf of Fireflow 31 Jul, 2021
Trading within the UK and between the UK and Europe just got a lot more complicated
Cladding on a tall building
By Whisper Digital on behalf of Fireflow Products (Original Source BBC Website) 13 Apr, 2021
MP's reject move for fire safety measures to be passed onto developers.
UK Vaccine - Update
By Whisper Digital posted on behalf of Fireflow Products (Original Source BBC News) 03 Feb, 2021
Latest news regarding new Covid-19 vaccine
By Phil 01 Jan, 2021
A new era has begun for the United Kingdom after it completed its formal separation from the European Union.
More Posts
Share by: